custom_ui/csv/Item Price-import-ready.csv
2026-02-19 11:02:06 -06:00

148 lines
19 KiB
CSV

ID,Item Code,UOM,Price List,Rate,Packing Unit,Item Name,Brand,Item Description,Customer,Supplier,Batch No,Buying,Selling,Currency,Valid From,Lead Time in days,Valid Upto,Note,Reference
028bea2a8e,SERV-0004,Each,Standard Buying,65.0,0,Start Up,,<div><p>Start Up Sprinklers</p></div>,,,,1,0,USD,03-05-2025,0,,,
04d409e574,DL-0045,Yard,Standard Selling,54.0,0,Large Nugget,,Large Nugget,,,,0,1,USD,,0,,,
0751d07aa2,DL-0033,Yard,Standard Selling,30.0,0,Granite A-Rock,,Granite A-Rock,,,,0,1,USD,,0,,,
0986e9be33,DL-0019,Yard,Standard Selling,42.0,0,"3/4"" Minus Basalt",,"3/4"" Minus Basalt",,,,0,1,USD,,0,,,
0e00cf42b2,BLDR - Sample Package 1,Each,Commerical Installation,1000.0,0,BLDR - Sample Package 1,,BLDR - Sample Package 1,,,,0,1,USD,02-07-2025,0,,,
0eface13a2,DL-0020,Yard,Standard Selling,97.0,0,Red Valley,,Red Valley,,,,0,1,USD,,0,,,
10a6ba6d26,DL-0008,Yard,Standard Selling,65.0,0,Mt Grey,,Mt Grey,,,,0,1,USD,,0,,,
1683a6757e,DL-0029,Yard,Standard Selling,37.0,0,Curb Sand,,Curb Sand,,,,0,1,USD,,0,,,
1706c2e18c,BLDR-Woodridge 4 Falcon Ridge Gallery,Each,Standard Selling,12300.0,0,Woodridge 4 Falcon Ridge Gallery Landscape Installation,,Woodridge 4 Falcon Ridge Gallery Landscape Installation,,,,0,1,USD,02-21-2025,0,,,
17ed4513b6,BLDR-Front Yard Landscape Installation,Each,Standard Selling,4500.0,0,Builder Landscape Installation,,Builder Landscape Installation,,,,0,1,USD,01-28-2025,0,,,
18802dcb0d,SNW-I-0017,Each,Commerical Installation,500.0,0,Plant Install,,<div><p>Installation of designated plant package to jobsite.</p></div>,,,,0,1,USD,02-13-2025,0,,,
19008402d9,SNW-I-0025,Each,Standard Selling,750.0,0,Bark & Weed Barrier,,Bark &amp; Weed Barrier to be installed in all designated areas.,,,,0,1,USD,08-15-2025,0,,,
1a4044e8fd,DL-0024,Yard,Standard Selling,95.0,0,Champaign,,Champaign,,,,0,1,USD,,0,,,
1aea533e41,DL-0037,Yard,Standard Selling,38.0,0,1/2 Shale,,1/2 Shale,,,,0,1,USD,,0,,,
1d81cfcf5d,DL-0006,Yard,Standard Selling,37.0,0,Container Blend,,Sand/Bartek,,,,0,1,USD,,0,,,
1e73c035f1,SNW-I-0006,Each,Standard Buying,185.0,0,Equipment Operator,,Equipment Operator,,,,1,0,USD,01-16-2025,0,,,
1e914222e1,DL-0040,Yard,Standard Selling,37.0,0,Sand & Gravel,,Sand &amp; Gravel,,,,0,1,USD,,0,,,
298d8d530a,BLDR-Woodridge 4 Falcon Ridge Gallery,Each,Standard Selling,12300.0,0,Woodridge 4 Falcon Ridge Gallery Landscape Installation,,Woodridge 4 Falcon Ridge Gallery Landscape Installation,,,,0,1,USD,02-24-2025,0,,,
2e5b7ddad0,SERV-0005,Each,Residential,60.0,0,Additional Backflow Test,,<div><p>Price Per Additional Backflow Test (when more than one backflow is required to be tested)</p></div>,,,,0,1,USD,02-12-2025,0,,,
2f2f841aa7,BLDR-Monogram Front Yard,Each,Standard Selling,4300.0,0,Monogram Front Yard Package,,<div><p>Installation of front yard builder package. </p></div>,,,,0,1,USD,01-28-2025,0,,,
2fb9dd4af5,DL-0046,Yard,Standard Selling,42.0,0,Dark Fines,,Dark Fines,,,,0,1,USD,,0,,,
30ef963682,SNW-I-0050,Each,Standard Selling,1800.0,0,Pump Truck,,Concrete pump truck with extendable arm that allows for Precise placement of concrete.,,,,0,1,USD,,0,,,
3111b26fbe,SNW-I-0030,Each,Standard Selling,5.5,0,Metal Edging,,Metal Edging to be installed to designated areas.,,,,0,1,USD,,0,,,
33f4fce6ec,SERV-0012,Each,Residential,120.0,0,Startup/Backflow,,<div><p>Start Up System And Perform Backflow Test.</p></div>,,,,0,1,USD,02-14-2025,0,,,
39444b3676,DL-0001,Yard,Standard Buying,28.0,0,Topsoil,,Topsoil,,,,1,0,USD,01-16-2025,0,,,
3c63f24be4,SNW-I-0054,Each,Standard Selling,500.0,0,Drip Zone install,,Installation of drip zone system to cover all desiganated areas.,,,,0,1,USD,01-24-2025,0,,,
3eca1d3e99,SERV-0012,Each,Commerical Installation,120.0,0,Startup/Backflow,,<div><p>Start Up System And Perform Backflow Test.</p></div>,,,,0,1,USD,02-12-2025,0,,,
4046cb9970,DL-0013,Yard,Standard Selling,85.0,0,Lg. Green Omak,,Lg. Green Omak,,,,0,1,USD,,0,,,
41d8f86449,SNW-I-0025,Each,Standard Buying,42.0,0,Bark & Weed Barrier,,Bark &amp; Weed Barrier to be installed in all designated areas.,,,,1,0,USD,08-18-2025,0,,,
41e307e76a,BLDR-Meadowlane Greens,Each,Standard Selling,11300.0,0,Meadowlane Greens Full Yard Landscape Package,,Meadowlane Greens Full Yard Landscape Package,,,,0,1,USD,02-21-2025,0,,,
46656517ae,SERV-0017,Each,Residential,160.0,0,Startup/Backflow/Winterize,,<div><p>Startup/ Backflow Test/ Prepay Fall Winterization</p></div>,,,,0,1,USD,02-14-2025,0,,,
46c6400432,BLDR-Lennar Plant Package,Each,Standard Selling,700.0,0,BLDR-Lennar Plant Package,,<div><p>Plant package for Lennar Homes</p></div>,,,,0,1,USD,01-27-2025,0,,,
471671e8ff,DL-0015,Yard,Standard Selling,42.0,0,"2-4"" Basalt Cobble",,"2-4"" Basalt Cobble",,,,0,1,USD,,0,,,
48076b1740,DL-0004,Yard,Standard Selling,43.0,0,3-1 Mix,,Topsoil/Bartek/Sandyloam,,,,0,1,USD,,0,,,
48520c1901,DL-0032,Yard,Standard Selling,42.0,0,Sandy Loam,,Sandy Loam,,,,0,1,USD,,0,,,
49a186d603,DL-0018,Yard,Standard Buying,42.0,0,"3/4"" Basalt",,"3/4"" Basalt A-Rock",,,,1,0,USD,08-18-2025,0,,,
4b858992df,DL-0005,Yard,Standard Selling,31.0,0,Garden Mix,,Dark fines/Topsoil,,,,0,1,USD,,0,,,
4db08a4b3d,DL-0003,Yard,Standard Selling,5.0,0,Dirty Drain Rock,,Drain rock material,,,,0,1,USD,,0,,,
4e0cedd652,SBE075,Each,Standard Selling,1.0,0,Rain Bird Spiral Barb Elbow 3/4 in. x 1/2 in. MIPT x Barb,,Rain Bird Spiral Barb Elbow 3/4 in. x 1/2 in. MIPT x Barb,,,,0,1,USD,05-08-2025,0,,,
4e2d24b4d8,BLDR - Sample Package 1,Each,Standard Selling,4500.0,0,BLDR - Sample Package 1,,BLDR - Sample Package 1,,,,0,1,USD,01-28-2025,0,,,
4e7a5baf93,DL-0050,Hour,Standard Buying,135.0,0,12-15 Yard Dump,,12-15 Yard Dump,,,,1,0,USD,01-17-2025,0,,,
4l0jeavd8r,SNW-I-0027,Each,Standard Selling,700.0,0,Hydroseeding,,Hydroseeding to be applied onto all designated areas.,,,,0,1,USD,01-03-2025,0,,,
4l0jkasmia,SNW-I-0018,Yard,Markup Price List,60.0,0,Topsoil Application,,Topsoil Application,,,,0,1,USD,01-03-2025,0,12-31-2025,,
4l0k6masv9,SNW-I-0017,Each,Standard Selling,65.0,0,Plant Install,,<div><p>Installation of designated plant package to jobsite.</p></div>,,,,0,1,USD,01-03-2025,0,,,
4l0kcta6un,PSMS147060,Each,Standard Selling,25.0,0,Paver Leiden Multi Stone Jamestown Blend,,(Sold by the layer),,,,0,1,USD,01-03-2025,0,,,
520a2496e9,BLDR- Small Plant Package,Each,Standard Selling,250.0,0,BLDR- Small Plant Package,,BLDR- Small Plant Package,,,,0,1,USD,01-27-2025,0,,,
52kh3l1c6o,SNW-I-DOOT,Nos,Standard Selling,30.0,0,Doot,,Blah,,,,0,1,USD,02-05-2026,0,,,
544bd7e4a4,DL-0042,Yard,Standard Selling,79.0,0,"1.5"" Rainbow",,"1.5"" Rainbow",,,,0,1,USD,,0,,,
54a631121f,BLDR - Sample Package 1,Each,Standard Buying,4500.0,0,BLDR - Sample Package 1,,BLDR - Sample Package 1,,,,1,0,USD,02-03-2025,0,,,
5a94b4899b,SERV-0003,Each,Standard Buying,55.0,0,Service Call Minimum,,<div><p>Service Call Minimum (half hour or less)</p></div>,,,,1,0,USD,03-05-2025,0,,,
5d53679192,DL-0028,Yard,Standard Selling,38.0,0,Pea Gravel,,Pea Gravel,,,,0,1,USD,,0,,,
5df9a9a9e8,DL-0007,Yard,Standard Selling,49.0,0,Bartek,,Compost soil 90% Forestry 10%Organics,,,,0,1,USD,,0,,,
5e1c628bc8,SERV-0002,Each,Residential,55.0,0,Fall System Winterize,,<div><p>Winterization of irrigation system</p></div>,,,,0,1,USD,02-14-2025,0,,,
5ie73htc9k,Tan Vinyl 1.5x5.5x8 Rail,Each,Standard Selling,18.74,0,Tan Vinyl 1.5x5.5x8 Rail,,Tan Vinyl 1.5x5.5x8 Rail,,,,0,1,USD,12-18-2024,0,,,
5ie77ll7ff,"Veka Almond 7/8""X6""X61.5"" T&G",Nos,Standard Selling,15.63,0,"Veka Almond 7/8""X6""X61.5"" T&G",,"Veka Almond 7/8""X6""X61.5"" T&amp;G",,,,0,1,USD,12-18-2024,0,,,
5ie7f8g3ve,"Tan Vinyl 11.3"" T&G",Each,Standard Selling,14.07,0,"Tan Vinyl 11.3"" T&G",,"Tan Vinyl 11.3"" T&amp;G",,,,0,1,USD,12-18-2024,0,,,
5ie8edsmhd,Labor,Nos,Standard Selling,165.0,0,Labor,,Labor,,,,0,1,USD,12-18-2024,0,,,
5ie8sk3ho1,Vinyl Gate Hinge,Per Set,Standard Selling,30.0,0,Vinyl Gate Hinge,,Vinyl Gate Hinge,,,,0,1,USD,12-18-2024,0,,,
61025f73b4,SNW-I-0034,Hour,Commerical Installation,150.0,0,General Labor,,General Labor,,,,0,1,USD,02-13-2025,0,,,
681a353a50,DL-0011,Yard,Standard Selling,42.0,0,"4"" Cobble",,"4"" Cobble",,,,0,1,USD,,0,,,
6892aeec3d,DL-0022,Yard,Standard Selling,95.0,0,China White,,China White,,,,0,1,USD,,0,,,
698b85bbdb,SERV-0005,Each,Standard Buying,60.0,0,Additional Backflow Test,,<div><p>Price Per Additional Backflow Test (when more than one backflow is required to be tested)</p></div>,,,,1,0,USD,02-12-2025,0,,,
6e91bea59c,DL-0021,Yard,Standard Selling,65.0,0,Purple Rage,,Purple Rage,,,,0,1,USD,,0,,,
7545a350fb,DL-0002,Yard,Standard Selling,20.0,0,Daniels Base,,Base Material,,,,0,1,USD,,0,,,
763ce91518,BLDR-Hayden Canyon Gold Front,Each,Commerical Installation,9800.0,0,BLDR-Hayden Canyon Gold Front,,BLDR-Hayden Canyon Gold Front,,,,0,1,USD,02-07-2025,0,,,
7e05f0c35f,White Vinyl 1.5x5.5x8 Rail,Each,Standard Selling,12.0,0,White Vinyl 1.5x5.5x8 Rail,,White Vinyl 1.5x5.5x8 Rail,,,,0,1,USD,01-24-2025,0,,,
7f8a67ac25,DL-0034,Yard,Standard Selling,30.0,0,Granite B-Rock,,Granite B-Rock,,,,0,1,USD,,0,,,
8229b74ad9,BLDR-Front Yard Irrigation Installation,Each,Standard Selling,2500.0,0,BLDR-Front Yard Irrigation Installation,,<div><p>Front yard Irrigation Installation: </p><p>3-4 Irrigation zones including 1 drip zone</p><p>All turf zones zoned with head to head coverage. </p><p>Drip zone to be installed underground with water going to each plant.</p></div>,,,,0,1,USD,01-27-2025,0,,,
86b976de4f,SNW-I-0018,Yard,Standard Buying,16.0,0,Topsoil Application,,Topsoil Application,,,,1,0,USD,08-18-2025,0,,,
88426a107u,BLDR-WOW,Nos,Standard Selling,11300.0,0,Wow,,wow,,,,0,1,USD,02-05-2026,0,,,
8suh4u50ra,VHS-0018,Each,Standard Buying,45.0,0,Paver Spikes,,Spikes,,,,1,0,USD,12-17-2024,0,,,
903e0cd87e,DL-0038,Yard,Standard Selling,38.0,0,3/4 Shale,,3/4 Shale,,,,0,1,USD,,0,,,
92bc03f7ec,BLDR-Meadowlane Greens,Each,Commerical Installation,11300.0,0,Meadowlane Greens Full Yard Landscape Package,,Meadowlane Greens Full Yard Landscape Package,,,,0,1,USD,02-24-2025,0,,,
9743f3e2a2,DL-0041,Yard,Standard Selling,79.0,0,3/4 Rainbow,,3/4 Rainbow,,,,0,1,USD,,0,,,
97c9841ad7,SERV-0001,,Standard Buying,0.0,0,Backflow Test Only,,<div><p>Backflow Test Only</p></div>,,,,1,0,USD,01-31-2025,0,,,
99b4ecbde4,DL-0035,Yard,Standard Selling,65.0,0,Iron Mt,,Iron Mt,,,,0,1,USD,,0,,,
9a509a80a6,DL-0031,Yard,Standard Selling,32.0,0,Course Sand,,Course Sand,,,,0,1,USD,,0,,,
a09261b096,SNW-I-0056,,Standard Selling,485.0,0,Backflow Installation,,Installation of Backflow,,,,0,1,USD,01-22-2025,0,,,
a102ba8219,SERV-0005,Each,Commerical Installation,30.0,0,Additional Backflow Test,,<div><p>Price Per Additional Backflow Test (when more than one backflow is required to be tested)</p></div>,,,,0,1,USD,02-13-2025,0,,,
a1fe8dc563,SNW-I-0012,Each,Standard Selling,500.0,0,Excavator,,Excavator,,,,0,1,USD,01-29-2025,0,,,
a29c769843,DL-0050,Hour,Standard Selling,270.0,0,12-15 Yard Dump,,12-15 Yard Dump,,,,0,1,USD,01-27-2025,0,,,
a30f9fd663,SNW-I-0058,Each,Standard Selling,800.0,0,Rotor zone install,,Rotor zone to be installed to all designated areas with head to head coverage.,,,,0,1,USD,01-24-2025,0,,,
a913677251,SERV-0001,Each,Commerical Installation,60.0,0,Backflow Test Only,,<div><p>Backflow Test Only</p></div>,,,,0,1,USD,02-13-2025,0,,,
a944e3ac05,SNW-I-0028,Each,Standard Selling,7.25,0,Curbing,,"Concrete curbing to be installed to all designated areas. (100"" minimum)",,,,0,1,USD,,0,,,
a9b4f75d88,DL-0039,Yard,Standard Selling,38.0,0,"2-3"" Shale",,"2-3"" Shale",,,,0,1,USD,,0,,,
aade78bb71,SNW-I-0036,Each,Standard Selling,4.25,0,Plastic Edging,,Plastic edging to be installed to all designated areas.,,,,0,1,USD,,0,,,
aae3510267,DL-0009,Yard,Standard Selling,61.0,0,Small Speckled Granite,,Small Speckled Granite,,,,0,1,USD,,0,,,
aee6df53a9,DL-0016,Yard,Standard Selling,42.0,0,"4-8"" Basalt Cobble",,"4-8"" Basalt Cobble",,,,0,1,USD,,0,,,
b19def7015,DL-0012,Yard,Standard Selling,85.0,0,Sm. Green Omak,,Sm. Green Omak,,,,0,1,USD,,0,,,
b1aca5ed08,BLDR-Lennar Package,Each,Commerical Installation,9800.0,0,BLDR-Lennar Package,,BLD,,,,0,1,USD,02-07-2025,0,,,
b687960f3d,DL-0030,Yard,Standard Selling,37.0,0,Fine Sand,,Fine Sand,,,,0,1,USD,,0,,,
bdec0ddb6a,DL-0026,Yard,Standard Selling,42.0,0,"1.5"" PHD",,"1.5"" PHD",,,,0,1,USD,,0,,,
bkne7f8o3s,BLDR-BIG-BIG-BUILDERS,Nos,Standard Selling,12700.0,0,Big Big Builders,,Big Builders,,,,0,1,USD,02-05-2026,0,,,
c211b2c087,SNW-I-0018,Yard,Standard Selling,65.0,0,Topsoil Application,,Topsoil Application,,,,0,1,USD,01-17-2025,0,,,
c2b6ee2472,DL-0018,Yard,Standard Selling,42.0,0,"3/4"" Basalt",,"3/4"" Basalt A-Rock",,,,0,1,USD,,0,,,
c4db4ab59e,DL-0001,Yard,Standard Selling,16.0,0,Topsoil,,Topsoil,,,,0,1,USD,,0,,,
c4f5ba1700,SNW-I-0024,Each,Standard Selling,2250.0,0,French Drain,,French Drain,,,,0,1,USD,01-27-2025,0,,,
c50e8f6577,Dump Fees,Each,Standard Selling,1000.0,0,Dump Fees,,<div><p>Dump Fees</p></div>,,,,0,1,USD,01-29-2025,0,,,
c82018d25a,DL-0044,Yard,Standard Selling,66.0,0,Small Nugget,,Small Nugget,,,,0,1,USD,,0,,,
cb8d088bd0,DL-0017,Yard,Standard Selling,42.0,0,"2"" Basalt",,"2"" Basalt",,,,0,1,USD,,0,,,
cj0snnhj1f,SNW-I-0034,Each,Standard Selling,35.0,0,General Labor,,General Labor,,,,0,1,USD,12-17-2024,0,,,
d07dc72e6b,SNW-I-0037,Each,Standard Selling,0.9,0,Sod Install,,Sod to be installed to designated areas as specified.,,,,0,1,USD,,0,,,
d68759f4ae,BLDR-Hayden Canyon Townhomes Bronze,Each,Standard Selling,4400.0,0,BLDR-Hayden Canyon Townhomes Bronze,,BLDR-Hayden Canyon Townhomes Bronze,,,,0,1,USD,02-11-2025,0,,,
d72eb32f2e,DL-0048,Yard,Standard Selling,42.0,0,Shredded,,Shredded,,,,0,1,USD,,0,,,
dc1fd7d474,BLDR-Medium Plant Package,Each,Standard Selling,450.0,0,BLDR-Medium Plant Package,,BLDR-Medium Plant Package,,,,0,1,USD,01-27-2025,0,,,
dc4e2eb529,BLDR-Tangled Ridge,Each,Standard Selling,11350.0,0,BLDR-Tangled Ridge,,BLDR-Tangled Ridge,,,,0,1,USD,02-11-2025,0,,,
dd451a1ae6,DL-0036,Yard,Standard Selling,90.0,0,Decomp Granite,,Decomp Granite,,,,0,1,USD,,0,,,
dd73018ac8,DL-0051,,Standard Buying,150.0,0,20-24 Yard Dump,,20-24 Yard Dump,,,,1,0,USD,01-17-2025,0,,,
de1rmums4j,SNW-I-0055,Each,Standard Selling,1450.0,0,POC Installation,,installation of point of conection.,,,,0,1,USD,01-08-2025,0,,,
de1spo8bcn,SNW-I-0005,Each,Standard Selling,625.0,0,Grading And Labor,,Grading And Labor,,,,0,1,USD,01-08-2025,0,,,
de9e25ff8b,DL-0049,Hour,Standard Buying,95.0,0,Small 6 yard Dump Truck,,Small 6 yard Dump Truck,,Daniels Landscape Supplies,,1,0,USD,01-17-2025,0,,,Daniels Landscape Supplies
dp1ssltjgs,SNW-I-DOOTER,Nos,Standard Selling,2030.0,0,Dooter,,Doot doot,,,,0,1,USD,02-05-2026,0,,,
e0cf8f09de,DL-0047,Yard,Standard Selling,46.0,0,Bright Fines,,Bright Fines,,,,0,1,USD,,0,,,
e39d799e7e,DL-0014,Yard,Standard Selling,143.0,0,Scoria,,Scoria,,,,0,1,USD,,0,,,
e543944bcf,SNW-I-0029,Each,Standard Selling,8.25,0,Curbing Color,,Color to be added to curbing to be installed.,,,,0,1,USD,,0,,,
e60d37ea58,DL-0010,Yard,Standard Selling,61.0,0,Large Speckled Granite,,Large Speckled Granite,,,,0,1,USD,,0,,,
e884241450,DL-0043,Yard,Standard Selling,79.0,0,"2-4"" Rainbow",,"2-4"" Rainbow",,,,0,1,USD,,0,,,
e8f24ceaea,SERV-0001,Each,Residential,85.0,0,Backflow Test Only,,<div><p>Backflow Test Only</p></div>,,,,0,1,USD,01-31-2025,0,,,
ee7c270ecf,BLDR-Tangled Ridge,Each,Commerical Installation,11350.0,0,BLDR-Tangled Ridge,,BLDR-Tangled Ridge,,,,0,1,USD,02-11-2025,0,,,
ef1377ef15,SERV-0015,Each,Residential,140.0,0,Spring Fertilize,,<div><p>Spring Fertilizer Application</p></div>,,,,0,1,USD,04-17-2025,0,,,
f24fec277c,DL-0023,Yard,Standard Selling,97.0,0,Chewelah Yellow,,Chewelah Yellow,,,,0,1,USD,,0,,,
f6a5e1b7dd,DL-0025,Yard,Standard Selling,37.0,0,3/4 Washed Round,,3/4 Washed Round,,,,0,1,USD,,0,,,
f6c2996a29,SNW-I-0006,Each,Standard Selling,185.0,0,Equipment Operator,,Equipment Operator,,,,0,1,USD,01-16-2025,0,,,
fe3a6a4f3d,SNW-I-0001,Each,Commerical Installation,125.0,0,Excavation,,Excavation,,,,0,1,USD,02-13-2025,0,,,
gp961regkt,SERV-0002,Each,Standard Selling,55.0,1,Fall System Winterize,,<div><p>Winterization of irrigation system</p></div>,,,,0,1,USD,12-09-2024,0,,,
hbvha1kiqv,SERV-0003,Each,Standard Selling,55.0,0,Service Call Minimum,,<div><p>Service Call Minimum (half hour or less)</p></div>,,,,0,1,USD,12-09-2024,0,,,
hghbpap5of,SERV-0004,Each,Standard Selling,65.0,0,Start Up,,<div><p>Start Up Sprinklers</p></div>,,,,0,1,USD,12-09-2024,0,,,
hjeg7705nm,SERV-0005,Each,Standard Selling,30.0,0,Additional Backflow Test,,<div><p>Price Per Additional Backflow Test (when more than one backflow is required to be tested)</p></div>,,,,0,1,USD,12-09-2024,0,,,
hpfpp4ph0o,SERV-0006,Each,Standard Selling,70.0,0,Additional Service Time,,<div><p>Charge $70 per 15min when service call runs over the allowed time.</p></div>,,,,0,1,USD,12-09-2024,0,,,
iafjtq1heh,SERV-0007,Each,Standard Selling,75.0,0,Outlying Backflow Test,,<div><p>Backflow Test Outlying Area</p></div>,,,,0,1,USD,12-09-2024,0,,,
idmm50lt36,SERV-0008,Each,Standard Selling,65.0,0,Outlying Winterize,,<div><p>Fall Winterization-Outlying Area</p></div>,,,,0,1,USD,12-09-2024,0,,,
ihndqvf7ev,SERV-0001,Each,Standard Selling,65.0,0,Backflow Test Only,,<div><p>Backflow Test Only</p></div>,,,,0,1,USD,12-09-2024,0,,,
isb7rsh7iv,SERV-0009,Each,Standard Selling,75.0,0,Outlying Startup,,<div><p>Spring Start Up-Outlying Area</p></div>,,,,0,1,USD,12-09-2024,0,,,
ivnthihgun,SERV-0010,Each,Standard Selling,130.0,0,Outlying Startup/Backflow,,<div><p>Outlying Areas Spring Turn on/Backflow Test</p></div>,,,,0,1,USD,12-09-2024,0,,,
j4uviejsud,SERV-0011,Each,Standard Selling,70.0,0,Service Call,,<div><p>Service Call (Billed at $70 Per Hour Per Tech)</p></div>,,,,0,1,USD,12-09-2024,0,,,
jai9q37en1,SERV-0012,Each,Standard Selling,120.0,0,Startup/Backflow,,<div><p>Start Up System And Perform Backflow Test.</p></div>,,,,0,1,USD,12-09-2024,0,,,
jflu3b6fqe,SERV-0013,Each,Standard Selling,170.0,0,Stoneridge Startup/Backflow/Winterize,,<div><p>Stoneridge Spring turn on/ Backflow test/ Prepay Fall Winterization.</p></div>,,,,0,1,USD,12-09-2024,0,,,
jhifdikd83,BLDR-BIG-TEST-KIT,Nos,Standard Selling,11700.0,0,Big Test Kit,,This is just a test,,,,0,1,USD,02-05-2026,0,,,
jmqt2928nj,SERV-0014,Each,Standard Selling,225.0,0,Mid Season Check Adjustments,,<div><p>Midseason Check adjustments</p></div>,,,,0,1,USD,12-09-2024,0,,,
jv3k43j5vj,SERV-0015,Each,Standard Selling,350.0,1,Spring Fertilize,,<div><p>Spring Fertilizer Application</p></div>,,,,0,1,USD,12-09-2024,0,,,
ntvjsadrkq,BLDR-TEST-HOUSES-PACKAGE,Nos,Standard Selling,900.0,0,Test houses package,,Test package,,,,0,1,USD,02-11-2026,0,,,
ost4kd4fiu,SNW-I-0053,Each,Standard Selling,2200.0,0,Installation Sprinkler System,,Installation of sprinkler system zoned with head to head coverage in all turf areas.,,,,0,1,USD,12-31-2024,0,,,
ou2r02dsg4,SNW-I-BOB-THE-BUILDER-PACKAGE,Nos,Standard Selling,1400.0,0,Bob The Builder Package,,This is a test,,,,0,1,USD,02-05-2026,0,,,
q6etqmej10,VHS-0018,Each,Standard Selling,45.0,0,Paver Spikes,,Spikes,,,,0,1,USD,12-09-2024,0,,,
skl3m36h2m,BLDR- Full Yard Sprinkler Installation,Each,Standard Selling,8000.0,0,BLDR- Full Yard Sprinkler Installation,,BLDR- Full Yard Sprinkler Installation,,,,0,1,USD,02-06-2026,0,,,
upoveng8h9,BLDR-BIG-BUILDER-INSTALL-PACKAGE,Nos,Standard Selling,2000.0,0,Big Builder Install Package,,This is a test,,,,0,1,USD,02-05-2026,0,,,