close #27496 1. Set pre-step (Set up job) status to `skipped` if job is skipped. 2. Apart from pre-step, the other steps should also be set to `skipped`. The status of other steps are reported from the runner side. This will be completed by this PR: https://gitea.com/gitea/act_runner/pulls/500 before:  after: 