brotherton-erpnext/erpnext/docs/user/manual/en/projects/activity-cost.md

303 B

Activity Cost records the per-hour billing rate and costing rate of an Employee against an Activity Type. This rate is pulled by the system while making Time Logs. It is used for Project Costing.

Activity Cost