7 lines
308 B
Markdown
7 lines
308 B
Markdown
# Activity Cost
|
|
|
|
Activity Cost records the per-hour billing rate and costing rate of an Employee against an Activity Type.
|
|
This rate is pulled by the system while making Time Logs. It is used for Project Costing.
|
|
|
|
<img class="screenshot" alt="Activity Cost" src="/docs/assets/img/project/activity_cost.png">
|