Production Plan tables for po_items and sub_assembly_items are prepared client side so both dont exist at time of first save or modifying and hence any "links" created are invalid. This change retains temporary name so it can be relinked server side after naming is performed. Co-Authored-By: Marica <maricadsouza221197@gmail.com>
Plan and manage manufacturing operations, bill of materials for manufacturing.