- make tests use multi level bom in WO, as BOM at setup is used - earlier, an intermediate BOM made in a test would override the BOM at setup
Plan and manage manufacturing operations, bill of materials for manufacturing.
- make tests use multi level bom in WO, as BOM at setup is used - earlier, an intermediate BOM made in a test would override the BOM at setup
Plan and manage manufacturing operations, bill of materials for manufacturing.