# Bill Of Materials At the heart of the Manufacturing system is the **Bill of Materials** (BOM). The **BOM** is a list of all materials (either bought or made) and operations that go into a finished product or sub-Item. In ERPNext, the component could have its own BOM hence forming a tree of Items with multiple levels.
To make accurate Purchase Requests, you must always maintain correct BOMs. To make a new BOM: > Manufacturing > Bill of Materials > New BOM