diff --git a/erpnext/docs/user/manual/en/manufacturing/production-order.md b/erpnext/docs/user/manual/en/manufacturing/production-order.md index a05a3878aa..685a2ca50f 100644 --- a/erpnext/docs/user/manual/en/manufacturing/production-order.md +++ b/erpnext/docs/user/manual/en/manufacturing/production-order.md @@ -62,7 +62,7 @@ by: Stock Entry for PO -#### Transfer through Stock Entry +#### Material Transfer through Stock Entry Use cases for this option are: * If material transfer is done in bulk and/or is not required to be tracked against a particular Production Order * If the responsibility for Material Transfer and Production Entry lies with two separate users