* Select the Item for which you want to make the BOM.
* Add the operations that you have to go through to make that particular Item in the “Operations” table. For each operation, you will be asked to enter a Workstation. You must create new Workstations as and when necessary.
* Workstations are defined only for product costing and Production Order Operations scheduling purposes not inventory.
* Inventory is tracked in Warehouses not Workstations.
###Costing of a BOM
* The Costing section in BOM gives an approximate cost of producing the Item.
* Add the list of Items you require for each operation, with its quantity. This Item could be a purchased Item or a sub-assembly with its own BOM. If the row Item is a manufactured Item and has multiple BOMs, select the appropriate BOM. You can also define if a part of the Item goes into scrap.